Planning tool

Drying Time Estimator for Upper Darby, PA

A quick read on how long a water loss in an older brick, stone or plaster home typically takes to dry with professional air movers and dehumidifiers running.

Typical drying time

4 to 6 days

With air movers and LGR dehumidifiers running around the clock and readings taken daily.

(888) 557-1733Start the dry-out on this loss

Estimate only, based on typical local losses. The restoration contractor who responds sets the real scope after the walkthrough and the moisture map.

How this tool works

Drying time depends most on the material and how saturated it is. A slab and tile give up water fastest, drywall and framing take longer, and hardwood, plaster on lath and stone are the slowest, which is why the IICRC S500 standard puts dense materials in Class 4. Cool basements and back additions in January slow evaporation and add time.

The estimate assumes professional equipment running continuously. On a real job the drying team pulls equipment when the wet materials read within 2 to 4 points of a dry reference in the same house, not on a date. See structural drying for how that works.

Emergency dispatch, any hour

Wet walls or floors right now? Start drying.

The drying team sets air movers and LGR dehumidifiers and logs readings every day until the goal is met.

(888) 557-1733Line up the drying equipment

Upper Darby Water Damage Restoration

The township and Delaware County

(888) 557-1733

Water and sewage losses only

Find us on Google
Basement or ceiling wet? Call (888) 557-1733